My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14647
DRMS
>
Back File Migration
>
Revision
>
REV14647
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:52 AM
Creation date
11/21/2007 10:54:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
12/22/2000
Doc Name
ROADSIDE PORTALS PN C-1981-041 TR 33 AND TR 35
From
DMG
To
CDOT REGIONAL DIRECTOR
Type & Sequence
TR33
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRCES Cost Estimating Software <br />BULLDOZER WORK <br />Agency or organization name :Colorado Division O/ Minera/s And Geology <br /> <br />Taskp: X01 State :Colorado Permitlobp:C-B1-041 <br />Dale: 1217312000 County :Mesa Abbreviation :none <br />User: JRS Site:Roadside Portals Filename :C041-X01 <br /> <br />Permit or other job action :Technical Revision 33 <br /> <br />Task description :Salvage Topsoil !torn Orill Ped Slof <br /> <br />HOURLY EQUIPMENT COST Basic machine :Cal D7H Series 2 (1996) Horsepower : 215 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : BOPS Cab Shill basis : 1 per day <br /> Anachment no. 2: NA <br /> <br /> Utilization % Cost data source : (CRG) <br />Cost Breaktlown : Ownershipcost/hour: $30.37 NA <br /> Operating cosUhour: $42.10 100 <br /> Ripper op. cosUhour : $0.00 NA <br /> Operator cosbhour: $23. I2 NA <br /> Total unit cosUhour: $95.58 Total fleet cosUhour : $95.58 <br />ERIAL <br />M <br />NT <br />AT <br />QUA <br />ITIES <br />Initial <br />Swell <br />Loose <br />volume: 800 BCY factor: 7.250 volume: 1,000 LCV <br />Souce of quantity takeoff :Division Estimate <br /> <br />Source of est. swell factor: CAT Handbook <br /> <br />HOURLY PRODUCTION <br />i' n F <br />Average push distance : 100 teal Source <br /> Operator skill : 0.75 (avg.) <br /> Maledal consistency: 0.80 (Cat HB) <br />Unatljustetl hourly production : 565 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 /avg.J <br />Material consistenty description : Job efficiency : O.B3 ()shill/day) <br />Dry, non-cohesive Spoil pile : 1.00 (doz-ocJ <br /> Push gradient : 1.00 (Cat HBJ <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cal RB) <br /> Maledal weight: 0.90 (Cal HB) <br />Average site altitutle: 5,000 feet Blade type: 1.00 (S or U) <br /> <br />Matedal weight : 2.550 Ibs/LCV Net correnion : 0.45 <br />Material weight description <br />Earth -Dry packed Adjusted unit production : 253.47 LCY/hr <br /> <br /> Adjusted fleet pmduction : 253.47 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : <br />/ Oozer(s) <br />Total job time : <br />3.95 <br />Hours <br />Unit cost: $0.377 /LCV Total lob cost: 5377 <br />
The URL can be used to link to this page
Your browser does not support the video tag.