Laserfiche WebLink
CIRCES Cost Estimating Sokware <br />BULLDOZER WORK <br />Agency or organization name :Colorado Diw'sion O! Minerals And Geology <br /> <br />Tasks: XQ2 State: Colorado PermiVjobk:C-01-041 <br />Dale: 72/13/2000 Counry:Mesa Abbreviation :none <br />User: JRS Site :Roadside Portals Filename:C041-X02 <br /> <br />Permit or other job action : Technical Revision 33 <br /> <br />Task description :Cut Drlll Pad Slot <br /> <br />HOURLY EQUIPMENT COST Basic machine: Cal D7H Sedes2 (7996) Horsepower : 215 <br /> Blade type : SemrUniversal <br /> Attachment no. 7 : ROPS Cab Shill basis : 1 per tlay <br /> Adachment no. 2: NA <br /> <br /> Utilization % CosC data source : (DRG) <br />Cost Breakdown : Ownership cost/hour : $30.37 NA <br /> Operating cosUhour: $42.70 100 <br /> Ripper op. cosUhour: $0.00 NA <br /> Operator cosVhour: $23.72 NA <br /> Total unll cosUhour: $95.58 Total fleet cosMOUr : $95.58 <br />MA <br />UAN <br />TERIAL Q <br />TRIES <br />Initial <br />Swell <br />Loose <br />volume: 2,700 HCY lector: 1.330 volume: 2,793 LCY <br />Souce of quan tity takeoff :Division Estimate <br /> <br />Source of est. swell )actor :CAT Handbook <br /> <br />HOURLY PRODUCTION <br />ni' rt i <br />Average push distance : 100 feet Source <br /> Operator skill: 0.75 (avg.) <br /> Material consistency: 0.60 (Cat HBJ <br />Unadjusted hourry protluction : 565 LGY/hr Dozing method : 1.00 (gen <br /> visibility: 1.00 (avg.) <br />Material consistency tlescdption: Job eNicienry: 0.83 (15hif1/day) <br />Dry, non-crohesive Spoil pile : 7.00 (doz~oc) <br /> Push gradient : 1.00 (Caf HBJ <br />Avemge push gradient : 0.00 9; (pos/ Altitude : 1.00 (Ca! HB) <br /> Material weight: 0.79 (Cal HB) <br />Avemge site altitude : 5,000 teat Blade type : 7.00 (S or U) <br /> <br />Material weigh) : 2.900 IbsJLCV Net correction : 0.39 <br />Matedal weight description <br />Decomposed rock ~ 50% Rock. 50% Eadh Adjusted unit production : 222.BB LCV/hr <br /> <br /> Atljusled fleet production : 222.88 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : <br />1 Dozers) <br />Total jab time : <br />12.53 <br />Hours <br />Unit cast : $0.429 /LCY Total job cos[: 57,198 <br />