My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14610
DRMS
>
Back File Migration
>
Revision
>
REV14610
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:49 AM
Creation date
11/21/2007 10:54:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
9/7/1999
Doc Name
Midterm Review Findings Document
Type & Sequence
MT3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rule 4.09 Disposal of Excess Spoil <br />No excess spoil has been identified to date. [f any spoil is left over due to the quantities of Flyash <br />used to fill the pits, it will be regraded to approximate original topography (PAP, page 114). <br />Rule 4.10 Coal Mine Waste Banks <br />In compliance by exception. There are no coal mine waste banks at [he site. <br />Rule 4.1 1 Coal Mine Waste <br />Rule 4.11.1 Burning <br />In compliance by exception. There is no burning of coal mine wastes at the site. <br />Rule 4.11.2 Burned Waste Utilization <br />In compliance by exception. There is no utilization of Bumed wastes at the site. <br />Rule 4.11.3 Return to Underground Workings <br />In compliance by exception. There is no return of mine waste to underground workings at the <br />site. <br />Rule 4.11.4 Disposal of Noncoal Waste <br />Incompliance. Provision for the disposal of noncoal waste in the backfill of the pits is at page <br />104 of the PAP. <br />Rule 4.11.5 Dams and Embattlements <br />Incompliance by exception. There aze no dams or embankments constructed of coalmine waste <br />or any intended to impound coalmine waste. <br />Rule 4.12 Slides and Other Damage <br />Incompliance. There aze no slides or other damage at the site. <br />Rule 4.13 Contemporaneous Reclamation <br />Incompliance. The reclamation timetable is presented on page 1 17 of the PAP. <br />Rule 4.14 Baekfilling and Grading <br />Rule 4.14.1 General Requirements <br />22 7 September 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.