My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE24892
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE24892
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:29 PM
Creation date
11/21/2007 10:50:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984062
IBM Index Class Name
Enforcement
Doc Date
6/6/1981
Doc Name
ENERGY 3 MINE APPLICATION FN C-36-81
From
MLR
To
ENERGY FUELS CORP
Violation No.
TD1990020244004TV2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h'If1R _% 'yu 18'5d CYRkUe YI IIA/+11 ~q ILLEY F, 7.r11 <br />~~A - ' <br />pile immediately east of the permanent overburder, ~:ile. However, the limited <br />amount of slumping does not w,'rrrant any disturbance ro the pile. <br />A21 topsoil that needed to be salvaged at the surface mine has been completed, <br />only topsoil redistribution zemains to be done. <br />Energy Fue15 needs t0 inform the Division when re-topsoiling of the <br />regraded areas will be initiated. (See Section 4.13 of this reportl. <br />4.07 Sealing of Drilled Holes <br />The operator has recently obtained approval to prospect in Twenty-mile Park, <br />sealing of theta drill holes are handled in the prospecting permit. Sealing <br />of existing monitoring holes will be handled in the pending application. <br />4,08 Explosives <br />Blasting records for three years are on file at the mince office. <br />No blasting is currently being conducted. <br />future, the operator will need to.repuhlish <br />in .accordance with 4.08, <br />~. 4.09 Disposal of Excess spoil <br />If blasting is to occur in the <br />a blasting schedule in the newspaper <br />One permanent overburden pile is Located S.w, of the proposed surface area <br />to be mined: This pile was approved under the existing Energy A3 Permit. <br />No additional material needs to be hauled to this pile however, it still needs <br />to be topsoiled and vegetated. she Division needs to have a commitrr~nt from <br />EFC as to when reclamation of this pile will occur: <br />4,10 Coal Processing waste Banks <br />Hot applicable <br />4.1I Coat Processing [Taste <br />4.I3 Contemporaneous Reclamation <br />This section requires that Reclamation efforts s1~a11 occur as contemporaneously <br />as practicable with mining operations. The Division needs a commitment from.. <br />EFC as to when Reclamation of the surface mine and permanent overburden pile <br />will occur. <br />4.19 Backfilling and Cradi~ <br />Much of the grading on the surface mine has been completed. The topography of <br />these areas looks good. As was men boned, EFC needs to inform the Division <br />aS to when the Test of the disturbed area will be re-graded. <br />4,15 Re-ve 4etati On <br />Re-vegetation of areas mined prior to May 3, 1978 has been very successful. <br />The Division has already released several areas from further liability. <br /> <br />.. <br />However, the Division still needs to know when reveyetation of the latest surface <br />mine wi1I commence. <br />
The URL can be used to link to this page
Your browser does not support the video tag.