My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE24717
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE24717
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:23 PM
Creation date
11/21/2007 10:47:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Enforcement
Doc Date
12/22/1980
Doc Name
NORTH THOMPSON CREEK MINING OPERATION FN 77-313
From
SNOWMASS CO
To
MLR
Violation No.
CV1980042
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~. <br />-z- <br />liners. I leave discussed the urgency of this work with the construction <br />manager at the site and Vie revealed that [hc liners (which are presently <br />on site) must be installed by specially trained technicians who will be <br />provided by the liner manufacturer. Arrangements have been made for their <br />arrival on December 18 - 19. The installation work will take 4 - 5 days <br />per pond. I have given instructions that the sediment control pond be <br />completed first. 1'lie construction manager has expressed a concern that <br />' 'the upcoming hulidays may delay compleCiun of Choir work. While I can <br />assure you [hat we will take every available step [o have the liners in- <br />stalled as soon as possible, delays due to holiday observance may 6e <br />beyond our control. <br />All site drainage control culverts have been installed at the loadout site. <br />Straw bales have been replaced at the loadout where the area for the con- <br />veyor base was excavated above the river bank. Additional straw bales <br />have been placed a[ the upstream end of the box culvert along the north <br />side of North Thompson Creek. <br />The mine No. 1 escape tunnel was constructed 20 - 30 years ago by the <br />original operator of the mine, North Thompson Coal and Coke Company. <br />While many accurate, detailed drawings of the mine workings are available, <br />none of them include the relatively short escape tunnel spur. At this <br />time, I have been unable to find any maps or drawings which would aid in <br />your evaluation of the escape tunnel area. Lining of the stream bank in <br />the vicinity of the ventilation building terrace with large rip-rap is <br />being considered at the present time, <br />As we discussed during our phone conversation on December 15, 1980, the <br />antifreeze chemical we rotund to use in the conveyor washdown water at <br />[tie loadout site is "Winterflow Coal Aid 1/101" and is supplied by Union <br />Carbide. <br />Topsoil Iandling <br />The timing of revegetation aC the loadout as well as intended seed mixtures <br />are discussed on pages 90 and 117 of the permit amendment application. <br />I have recently discussed the importance of proper topsoil handling with <br />our surface Eureman. I I~avc also asked liim to instruct tl~e equipment <br />operators working at the rcCuse disposal site co use extreme care not to <br />cover any topsoil with waste material. <br />'technical revisions will br prepared Cor any plan changes occurring at <br />the Loadout site, and will be submitted Eor your review as required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.