REQUEST FOR ADJUSTMENT IN TIMETABLE FOR IMPLEMENTATION OF CORRECTIVE ACTION PLAN FOR SNYDER QUARRY
From
MARK A HEIFNER
To
MLRB
Violation No.
MV1989015
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />6. OTHER FACTORS: <br />1. Since the Corrective Action Plan wea approved Gordon Morga:+, <br />President of Castle Concrete, and Mark Heifner, Castle Concrete's <br />reclamation consultant, have been heavily involved with the Queen's <br />Canyon Quarry. Part of the several hundred hours they have spent <br />involved actual meetings, but moat of this time involved planning tk~e <br />final disposition of the Queen's Canyon Quarry and, to a leaser extent, <br />the other two quarries. Because of these unusually intense time demands <br />needed to complete these important negotiations, other reclamation <br />projects at other operations had to be canceled for 1990. What little <br />time was left was devoted to completing this work and other essential <br />reclamation work at the Queen's Canyon Quarry and the Hobson Ranch Fit <br />//1. Next spring it will be necessary to catch up on the work that had <br />to be canceled this year simply because there was insufficient time to <br />implement that work. It is Castle Concrete's position that the time <br />spent in finding a solution to the Queen's Canyon Quarry situation that <br />ie satisfactory to a majority of the public interested in that matter is <br />time well spent. But the time requirements are so vast, severe <br />prioritization of other work was required. The Snyder Quarry Corrective <br />Action Plan was placed as a top priority, but time was so limited even <br />it did not get entirely finished. If the major anoxstorm had not hit in <br />early May, it is probable there would have been time to plant trees on <br />at least those areas that were finished with topsoiling and in Willi~gms <br />Canyon. <br />2. The originally proposed Corrective Action Plan presented a <br />timetable that started major work on the project in early November 1~~89 <br />(see letter of October 23, 1989 from Heifner to Banta). Ae a result of <br />additional considerations, Board approval did not come until December- <br />13, 1989 and the order was not actually signed and sent until Januar;~ <br />16, 1990. Minor work began about November Q, 1989, but major work h+sd <br />to be delayed, first until Board authorization was received, and then <br />until late February, March, and April because of frozen ground <br />conditions and weather. If major work had been able to begin in <br />November 1989 the timetable proposed in October 1989 could have larg+3ly <br />been met, although the May snowstorm might still have caused delays :_n <br />the completion of certain aspects. Because timetables for reclamation <br />work must be patterned around the seasons and not the calendar, stari:ing <br />with major work several months after the originally proposed start dates <br />caused a severe "bunching" of major earthwork operations. This <br />"bunching" occurred during a time of the year when frozen ground is <br />thawing and heavy, wet snowstorms are fairly common. Fall and early <br />winter is the preferred to time to do the kind of work required becai+se <br />the ground is dry and precipitation low. Aa a result of the additional <br />considerations of provisions in the plan in November 1989, a timetable <br />that could have been met and was adjusted as best as could be done at. <br />the time of Board approval, became unvorkable in light of the fact tk+at <br />Colorado Springs, since the beginning of 1990, has received <br />approximately twice as much precipitation as normal, mainly since the: <br />beginning of May 1990. <br />Page 5 of 7 SNYDER CAP TIMETABLE ADJIISTMENT 6-20-90 <br />