REQUEST FOR ADJUSTMENT IN TIMETABLE FOR IMPLEMENTATION OF CORRECTIVE ACTION PLAN FOR SNYDER QUARRY
From
MARK A HEIFNER
To
MLRB
Violation No.
MV1989015
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROPOSED TIMETABLE FOR COMPLETION <br />WILLIAMS CANYON: Plant all trees not later than October 10, 1990. <br />Initiate monitoring system by October 20, 1990. (Based on average frost <br />dates.) <br />ROAD DISTURBANCE AREA #1: Repair any summer erosion problems by Oct~~ber <br />1, 1990. Reseed the repair areas within 10 days of completion of repair <br />work. Plant containerized trees not later than October 10, 1990. <br />Initiate monitoring system by October 20, 1990. (Based on average f:-ost <br />dates.) <br />ROAD DISTURBANCE AREA #4: Complete grading, shaping and topsoiling ley <br />October 1, 1990. Plant seed by October 10, 1990. Plant containerized <br />trees not later than October 10, 1990. Initiate monitoring system b~~ <br />October 20, 1990. (Based on average frost dates.) <br />CULVERT HR6: As soon as a decision is made regarding which design <br />option should be used, install the culvert. There are currently 11 <br />possible options including the ones proposed by Castle Concrete, tho~3e <br />proposed by the Mined Land Reclamation Division, and those proposed ley <br />Greg Nagel. The recent submittal of the Cedar Heights Lender's anal~~eis <br />by Kiowa Engineering seems to have effectively reduced the possible <br />options to perhaps three. <br />ROAD DISTURBANCE AREAS #2 AND #3~ Stability analysis by William Hof]'man <br />has been completed. If Hoffman recommendations are accepted, complei;e <br />earthwork, topsoil application, and seeding by February 1, 1991. Plant <br />trees by May 1, 1991. There is insufficient containerized tree <br />seedlings in maintenance to plant this area by October 10, 1990. More <br />trees need to be ordered for next spring. The deficiency is the result <br />of not being able to store the bare root Juniper stock. If available:, <br />containerized Juniper stock will be ordered instead of bare root. Ttiis <br />will make up for the time lost by not planting Junipers in the sprinE; of <br />1990. If containerized Juniper is not available next year, bare roo]: <br />Juniper will be planted. <br />SEDIMENT BASIN: System fully operational by September 30, 1990. <br />Page 6 of 7 SNYDER CAP TIMETABLE ADJUSTMENT 6-20-90 (7-24-90 Modif.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.