My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE24633
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE24633
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:20 PM
Creation date
11/21/2007 10:45:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
Enforcement
Doc Date
6/20/1990
Doc Name
REQUEST FOR ADJUSTMENT IN TIMETABLE FOR IMPLEMENTATION OF CORRECTIVE ACTION PLAN FOR SNYDER QUARRY
From
MARK A HEIFNER
To
MLRB
Violation No.
MV1989015
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3. SILT RETENTION FACILITY: <br />a. Inquiry ae to need for 404 permit made January 8, 1990. <br />b. Response regarding 404 permit not being needed sent <br />January 11, 1990 from U. S. Army Corps of Engineers. <br />c. Pond design submitted to MLRD on January 31, 1990. <br />d. MLRD adequacy letter on design sent March 30, 1990. <br />e. Responses to adequacy letter sent April 20, 1990. <br />f. Approval of silt pond design sent May 1, 1990. <br />4. CULVERTS: <br />a. All culverts except for HR6 installed. <br />b. Design for HR6 submitted to MLRD March 23, 1990• <br />c. Copy of HR6 design received by Cedar Heights Lenders <br />representative March 21, 1990. <br />d. Design of HR6 approved by MLRD April 4, 1990. <br />e. Cedar Heights Lenders retains engineer to review HR6 plan <br />May 1, 1940. <br />f. Communications between Scott Briggs and Lenders <br />representatives. <br />1. January 4, 1990 - Briggs talked to Brenda Bartels of <br />Sparks, Dix, Enoch & Winslow regarding Board order <br />requirements and deadline. <br />2. March 15, 1990 - Lenders obtain a new attorney - Tammy <br />Akers of Gorsuch, Kirgis, Walker, and Grover. <br />3. March 21, 1990 - Briggs transmits HR6 plan to Akers. <br />4. April 24, 1990 - Briggs transmits MLRD options on HR6 to <br />Akers and to Bartels. <br />5. May 1, 1490 - Akers advises Briggs that engineer has been <br />hired to review plan. <br />6. May 2, 1990 - Akers sends letter to Hernandez. <br />7. May 29, 1990 - Briggs inquires as to status to engineer's <br />review of plan. <br />5. ROCKFALL HAZARD: <br />a. All operations in Phase I have been pulled back from Willians <br />Canyon rim. <br />WORK CURRENTLY IN PROGRESS AND PARTIALLY COMPLETED: <br />1. ROAD SIDE DAMAGES: <br />a. Area N4 is nearly completed (only some additional grading, <br />shaping, and topsoiling is needed, but it can only be done with <br />specialized rental equipment that is currently unavailable). <br />Page 2 of 7 SNYDER CAP TIMETABLE ADJUSTMENT 6-20-90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.