Laserfiche WebLink
<br />EVIDENCE TO JUSTIFY TIMETABLE ADJUSTMENT <br />LIST OF WORK TO BE DONE IN CORRECTIVE ACTION: <br />1. WILLIAMS CANYON: <br />a. Reseed disturbances by November 1, 1990. <br />b. Plant trees by June 1, 1990. <br />c. Monitor success of plantings. <br />d. Report results of monitoring program in annual reports. <br />2. ROAD SIDE DAMAGES: <br />a. Regrade roadside disturbances in accordance with plans. <br />b. Reseed disturbances by November 1, 1990. <br />c. Plant trees by June 1, 1990. <br />d. Monitor success of plantings. <br />e. Report results of monitoring program in annual reports. <br />3. SILT RETENTION FACILITY: <br />a. Submit plans 60 days prior to construction. <br />b. Construct after approval. (No specified date for completion, <br />but assumed as being as soon as possible.) <br />!,. CULVERTS: <br />a. Install culverts as per plans. <br />b. Submit as-built draxings of culverts within 60 days after <br />construction. <br />c. Resolve dispute over HR6 by March 31, 1990. <br />5. ROCKFALL HAZARD: <br />a. Take measures to insure that no off site impacts due to rock~.'all <br />or flyrock occurs. <br />WORK THAT HAS BEEN COMPLETED: <br />1. WILLIAMS CANYON: <br />s. Williams Canyon disturbances were seeded in May 1990. (requi:ed <br />seeding by November 1, 1990) <br />2. ROAD SIDE DAMAGES: <br />a. Area //1 graded, topsoiled, seeded in May 1990. (required <br />seeding by November 1, 1990) <br />b. Old Scale Site backfilled. <br />c. Disturbances 115, //6, and /~7 graded, topsoiled, and were seec.ed <br />on November 8, 1989. (required seeding by November 1, 1990) <br />Page 1 of 7 SNYDER CAP TIMETABLE ADJUSTMENT 6-20-90 <br />