My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV13565
DRMS
>
Back File Migration
>
Revision
>
REV13565
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:24:39 AM
Creation date
11/21/2007 10:43:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Revision
Doc Date
10/30/1997
Doc Name
SENECA II-W MINE PN C-82-057 TR 28
From
SENECA COAL CO
To
DMG
Type & Sequence
TR28
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approximately be the start of the reclaimed 4:1 slope and <br />reclaimed drainage channel. Please refer to Figure No. 1 that <br />was submitted with the September 24, 1997 package. All A pit <br />drainage will still flow along the toe of the boxcut spoil <br />down towards pond 006. Seneca will monitor the drainage <br />through the winter to make sure water is not being dammed up <br />and is heading down the drainage. <br />Based on our meeting with the Division on October 7th, Exhibit <br />19-1, Backfilling and Grading Schedule, is in the process of <br />being updated and a revision being submitted since it has been <br />almost two years since this was last revised. Seneca will take <br />into account the 006 gulch disturbance and update this area as <br />well. It will take 3 or 4 pits south of the drainage before <br />final backfilling and grading will occur in this area. Seneca <br />will initiate activities in the summer of 1998 to create as <br />much of the final drainage configuration as possible. <br />4. Specific channel designs for 005-E1, 006-E1 and 006-SE1 have <br />been inadvertently left out of the permit package entirely. <br />They will be submitted to the Division as part of the <br />stipulation package and the Pond 006 redesign. <br />5. Table 20-2, Pre- and Postmine Drainage Channel Summary, will <br />be updated and submitted as part of the stipulation package <br />and the Pond 006 redesign. Also see response 4. <br />Pond 006 Stin~lation ommen.c <br />6. Based on the assumptions and conditions used in modeling Pond <br />006-Phase III design, the anticipated "worst case" scenario <br />for the life-of-mine disturbance area has been exceeded by the <br />current field conditions. Seneca will reevaluate the entire <br />Pond 006 model and determine the best long-term approach and <br />solution for the 006 drainage area and submit this plan to the <br />Division by December 1, 1997 in the form of a technical <br />revision. <br />7. Seneca with the approval of this revision, will make the <br />necessary changes in the subwatershed characteristics of the <br />Pond 006 model mentioned in comments 6 and 7. <br />8. A. The only modification to sediment pond 006 phase III as- <br />built from the phase II as-built was the cutting of the 4" <br />dewatering orifice at the 7068.0 elevation. Exhibit 13-6 is an <br />AutoCAD drawing which I was unable to locate in the transfer <br />of all permit and computer information from the Flagstaff <br />office to the Seneca Mine when I was transferred here. It is <br />also true that culvert F3 is missing from Exhibit 13-6. When <br />Seneca submits the Pond 006 redesign a new exhibit depicting <br />current as-built conditions will be included. <br />B. The current emergency spillway elevation is 7070.8 and not <br />
The URL can be used to link to this page
Your browser does not support the video tag.