Laserfiche WebLink
<br /> <br />9 <br />7075.1. All materials related to the phase I design and as- <br />built should not even be in the permit package. <br />C. The top of dam elevation is at 7078.8 and the emergency <br />spillway at 7070.8. Therefore, these are the correct <br />elevations as shown on Exhibit 13-6. <br />D. The trash rack shown on Exhibit 13-6 is correct. The <br />principal spillway detail is not drawn to scale. The actual <br />trash rack has a tighter spacing pattern than is depicted on <br />the exhibit. <br />Seneca will include pit pumping <br />if it is determined that we <br />practice. A baseflow of 0.017 <br />revised model similar to other <br />into account pit pumping. <br />in the revised Pond 006 model, <br />will need to continue this <br />cfs will be utilized in the <br />Seneca pond designs which take <br />LJ <br />