Laserfiche WebLink
SEHECA II-W PERMIT C-82-057 <br />. Technical Revision 28 <br />Respoase to Division of Minerals and Geology <br />10/20/97 Adequacy Letter <br />October 28, 1997 <br />1. The cross sections are labeled correctly on Exhibit 20-2. <br />Exhibit 20-4.3, Pre and Post Mining Slopes, was revised to <br />show the proper labeling for Cross-Sections S-5 and S-6. <br />2. As the Division stated, with the implementation of this <br />revision a change in the characteristics of the subwatershed <br />#4(J1B1SWS4) to disturbed from undisturbed will occur. <br />Sediment Pond 006 will be remodeled taking this change into <br />account. Until the Pond 006 Stipulation is resolved, Seneca <br />proposes the following temporary sediment control measures for <br />the 006 drainage area. This plan will also assist in detaining <br />water from entering the pond until we can adequately remove <br />the existing sediment contained in the pond at the present <br />time. <br />A temporary diversion channel has been constructed from the T- <br />7 stocktank to the existing bottom portion of the B pit that <br />already contains surface water runoff from the B pit drainage <br />area. This diversion will be a 6 feet wide bottom ditch with <br />3:1 side slopes and is several feet deep. A SEDCAD+ output for <br />this diversion channel is attached. The 006 Gulch reclaimed <br />channel has a discharge amount of 26.4 cfs from a 100 year - <br />24 hour storm event. The temporary channel was designed for a <br />conservative discharge of 35 cfs. <br />The temporary diversion flows into a 48 inch diameter culvert <br />that was installed in the pit ramp that is north of the 006 <br />Gulch. A SEDCAD+ output for this culvert is also attached. <br />Seneca will monitor both the temporary diversion and culvert <br />to ensure that they are functioning properly and that their <br />integrity is not compromised. The water will then empty into <br />the bottom of the B pit. A second culvert in the pit ramp is <br />currently utilized to run a hose attached from the pump in the <br />B pit to the entrance of culvert A1. Water will be pumped from <br />the B pit into pond 006 once sediment removal from the pond is <br />completed. Water will also be pumped as necessary from the B <br />pit to maintain a safe water level in the pit as well as in <br />the pond. This plan will be followed until the pond 006 <br />Stipulation has been resolved and the permanent plan can be <br />implemented. <br />3. The reclaimed 006 gulch will actually begin to be constructed <br />• once spoil material is placed in the drainage as the boxcut <br />pit is stripped. The toe of the boxcut spoil will <br />