My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV13484
DRMS
>
Back File Migration
>
Revision
>
REV13484
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:24:32 AM
Creation date
11/21/2007 10:42:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Revision
Doc Date
8/4/1985
Doc Name
MID TERM REVIEW MEETING BEAR COAL CO FRIDAY JULY 26 1985
From
ACZ INC
To
MLRD
Type & Sequence
MT1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Randy Spencer <br />Ms. Susan Mowry <br />August 1, 1985 <br />• C.4 <br />Page Four <br />Bear Coal Company stated they would like, as a first step, <br />to evaluate the current year's monitoring data on the land <br />slide and if it shows that there has been significant <br />movement that re-engineering would be in order. If <br />re-engineering repair or replacement is necessary, plans to <br />do so would be submitted to the Division for approval. <br />• D.1 <br />Bear Coal Company stated in the meeting that the bridge and <br />conveyor footings have been removed as of July 22, 1985. <br />• E.1 <br />The Bear Coal Company agreed to discuss a reclamation plan <br />with Gunnison County and to develop a plan for the Division <br />to reclaim the flood control berm. <br />• E.2 <br />The Bear Coal Company agreed to review hydrology information <br />in the area and supply any spring locations on the current <br />geology/hydrology map (Map 6). It was suggested by the <br />Division to look at the West Elk Coal Company mine permit <br />and review their information on springs in the area. <br />• E.3 <br />The Bear Coal Company agreed to submit a map .showing <br />alluvial monitoring well locations at the Bear No. 3 Mine <br />along with piezometric contours. It was pointed out that no <br />alluvial monitoring wells were present at Bear No. 1 and No. <br />2 Mines. The Division agreed that Bear Coal Company did not <br />need to supply a map showing wells or piezometric contours <br />at Bear No. 1 and No. 2 Mines. <br />• E.4 <br />Bear Coal Company stated that they had the Mine Usage and <br />Inflow Report and that it would be submitted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.