My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV12975
DRMS
>
Back File Migration
>
Revision
>
REV12975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:23:57 AM
Creation date
11/21/2007 10:37:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
4/2/1984
From
ANACONDA MINERALS CO
To
MLRD
Type & Sequence
MT1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br /> <br />MINING AND RECLAMATION PLAN <br />MT, GUNNISON NO. 1 MINE <br />TABLE 4,8.1.C <br />SUMMARY OF MOBILE <br />• <br />February 1981 <br />Revised March 1984 <br />IPMENT COSTS FOR RECLAMATION <br />RiPpinq ~`~.ch- <br />Bulldozer cost is 98/hour from Mobile Equipment Costs. <br />Cost per acre <br />1613 yd.3 of material per acre can be rimed by a D9 Bulldozer per hour. <br />Volume to be ripped per acre = 1,613 yd3/acre <br />Therefore, equipment cost of ripping = 398/acre / <br />Gn y <br />Topsoilinq From Stockpile <br />Scraper cost is 3152.08/hour from Mobile Equipment Costs. <br />The Scraper can move approximately 140 yd.3/hour as shown under the Mobile <br />Equipment Costs. <br />152.08/hour = 31.09/yd3 <br />140 yd.3/hour <br />Cost Per Acre <br />2420 yd .3 X 31.09/yd.3 = 32638 <br />Acre ~Q L <br />The basis for the Mobile Equipment Operating Cost Follow. <br />4-34c <br />
The URL can be used to link to this page
Your browser does not support the video tag.