Laserfiche WebLink
MINING AND RECLAMATION PLAN Revised March, 1984 <br />MT. GUNNISON N0. 1 MINE <br />SUMMARY OF DEMOLITION COST CALCULATIONS - cont'd <br />Substation Removal <br />Total substation cost <br />Labor portion: 40% <br />Installation labor <br />Demolition: 15% of installation labor <br />Demolition Cost <br />Power Line Removal <br />Total construction cost <br />Labor portion: 40% <br />Installation labor <br />Demolition: 15% installation labor <br />Demolition Cost <br />Shop/Warehouse Removal <br />Total construction cost <br />Labor portion: ~30% <br />Installation labor <br />Demolition: 15% installation labor <br />Demolition Cost <br />Mine Office/Changehou se and Administration Trailers <br />8 trailer units @ $2500/unit <br />Railroad Track Removal <br />4000 if @ $12/lf <br />Fan Removal <br />Allow <br />_ $475,000 <br />x .40 <br />$190,000 <br />x .15 <br />S 29,000 ($1982) <br />$ 30,160 ($1984) <br />= E157,000 <br />x .40 <br />S 63,000 <br />r 1S <br />S 10,000 ($1982) <br />$ 10,400 ($1984) <br />_ $491,000 <br />x .30 <br />$147,000 <br />x .15 <br />$ 22,000 ($1982) <br />$ 22,880 ($1984) <br />_ $ 20,000 ($1982) <br />S 20,800 ($1984) <br />_ $ 48,000 ($1982) <br />5 49,920 ($1984) <br />$ 10,000 ($1982) <br />$ 10,400 ($1984) <br />4-34b(2) <br />