Laserfiche WebLink
MINING AND RECLAMATION PLAN <br />MT. GUNNISON N0. 1 MINE <br />4.8 Reclamation Costs <br />n <br />October, 1979 <br />Revised March, 1981 <br />Revised January 30, 1981 <br />Revised March, 1984 <br />Table 4.8.1 .A represents the estimated costs for revegetation activities on a <br />per-acre basis on the Mt. Gunnison No. 1 Mine Site. These costs are expressed <br />in terms of 1983 dollars; however, some areas will not be scheduled for <br />revegetation until mine closure approximately 40 years from now. <br />Tables 4.8.1.8 and 4.8.1 .C represent the estimated costs and calculations for <br />the demolition of surface facilities. These costs are expressed in terms of <br />1984 dollars. <br />The total from Tables 4.8.1 .A and 4.8.1.8 represent the amount to be used in <br />reclamation bonding calculations. <br />4-34 <br />