Laserfiche WebLink
<br />MINING AND RECLAMATION PLAN October, 1979 <br />MT. GUNNISON N0. 1 MINE Revised March, 1981 <br />Revised January 30, 1981 <br />Revised March, 1984 <br />TABLE 4.8.1.A <br />REVEGETATION COST ESTIMATE <br />A. Rangeland (110 acres) <br />Activity <br />Ripping <br />Topsoiling from Stockpile ~ <br />(18' over 1 acre 2420 cu. yd.3 x 1.09~cu. yd.) <br />Seedbed Preparation and Fertilization <br />Drill Seeding* <br />Mulching* <br />110 acres x $3916/acre = <br />B. Wildlife Shrub Clusters (30 acres) <br />Tublings <br />900 tublings/acre x 30 acres x $.65 <br />Labor (5-man team) <br />Cost/Acre <br />$ 98/acre - <br />2,638/acre <br />180/acre <br />600/acre - <br />400/acre <br />53,916/acre d~ <br />$430,760 <br />17,550 <br />- Training 1 day x 5 ~ 5 man-days <br />- Operations <br />400 tublings/day/team <br />27,000 tublings x 5 338 man-days <br />400 tub ling/day/team <br />338 x S80/man day contract labor *** _, 27,040 <br />TOTAL: $475,350 <br />* Hydroseeding and hydromulching of <br />also cost $1,000/acre combined. <br />on contractor's costs at Atlantic <br />** Cost Estimate from Native Plants, <br />*** Contract labor cost for revegeta <br />Mine. <br />slopes greater than 3:1 and ditches will <br />Both drill and hydroseeding costs based <br />Richfield's Black Thunder Mine. <br />Salt Lake City, Utah. <br />tion at Atlantic Richfield's Coal Creek <br />4-34a <br />