My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV12975
DRMS
>
Back File Migration
>
Revision
>
REV12975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:23:57 AM
Creation date
11/21/2007 10:37:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
4/2/1984
From
ANACONDA MINERALS CO
To
MLRD
Type & Sequence
MT1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MINING AND RECLAMATION PLAN October, 1979 <br />MT. GUNNISON N0. 1 MINE Revised March, 1981 <br />Revised January 30, 1981 <br />Revised March, 1984 <br />TABLE 4.8.1.A <br />REVEGETATION COST ESTIMATE <br />A. Rangeland (110 acres) <br />Activity <br />Ripping <br />Topsoiling from Stockpile ~ <br />(18' over 1 acre 2420 cu. yd.3 x 1.09~cu. yd.) <br />Seedbed Preparation and Fertilization <br />Drill Seeding* <br />Mulching* <br />110 acres x $3916/acre = <br />B. Wildlife Shrub Clusters (30 acres) <br />Tublings <br />900 tublings/acre x 30 acres x $.65 <br />Labor (5-man team) <br />Cost/Acre <br />$ 98/acre - <br />2,638/acre <br />180/acre <br />600/acre - <br />400/acre <br />53,916/acre d~ <br />$430,760 <br />17,550 <br />- Training 1 day x 5 ~ 5 man-days <br />- Operations <br />400 tublings/day/team <br />27,000 tublings x 5 338 man-days <br />400 tub ling/day/team <br />338 x S80/man day contract labor *** _, 27,040 <br />TOTAL: $475,350 <br />* Hydroseeding and hydromulching of <br />also cost $1,000/acre combined. <br />on contractor's costs at Atlantic <br />** Cost Estimate from Native Plants, <br />*** Contract labor cost for revegeta <br />Mine. <br />slopes greater than 3:1 and ditches will <br />Both drill and hydroseeding costs based <br />Richfield's Black Thunder Mine. <br />Salt Lake City, Utah. <br />tion at Atlantic Richfield's Coal Creek <br />4-34a <br />
The URL can be used to link to this page
Your browser does not support the video tag.