My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV12927
DRMS
>
Back File Migration
>
Revision
>
REV12927
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:23:54 AM
Creation date
11/21/2007 10:37:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
9/24/1999
Doc Name
PR 3 FACILITIES EXPANSION AND PRODUCTION INCREASE BOWIE 2 MINE PN C-96-083 BOWIE RESOURCE LIMITED
From
DMG
To
BOWIE RESOURCES LIMITED
Type & Sequence
PR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />the Division and of the users if problems arise. Finally, the Division advises BRL <br />to contact the Colorado Department of Public Health and Environment concerning <br />this potential change in the receiving stream for the mine water discharge. <br />9b. Please provide a discussion in the permit as to the exact method that will be used <br />for bringing the mine water discharge do+vn the hill within the permit area. <br />Please provide modified hydrology designs for any czlverts or ditches t{znt will <br />receive the ndditionnl flow. Please show any ne+v slructzrres on an appropriate <br />map. The revised NPDES permit states that mine x•ater discharge may <br />commingle with swface runoff in pond C. If the mine water will be put into pond <br />C before discharge, please update the designs for that pond, ns well as the <br />designs for any culverts and ditches, inc/trding Old Highway 13j culverts and <br />road ditches, involved in the flow path. Obviously, these designs wozzld need to <br />be approved by the Division before the mine water could be routed throzrgh the <br />drainage control system. <br />The revised NPDES permit also states that domestic waste water treatment will <br />commingle with pond B surface rzrnoff water. /f Bowie Resozrrces wishes to, the <br />discussion and modifications that +vill be necessary for the tivnste water addition <br />can be provided with this revision. <br />BRL has not responded to this question yet. Please provide a response. <br />9c. Once mine water discharge is transported over the Deer Trail Ditch and the Fire <br />Mountnin Canal, what will be the effect of the water quantity and quality on <br />downstream users ? Please add this discussion to [he probable hydrologic <br />consequences section, per Rule 2.O.i.ti(3)(b)(iii). Inclzrde in this discussion <br />whether this discharge can possibly adversely affect the North Fork of the <br />Gunnison Alluvial Valley Floor or any prime farmland. If structures will be <br />added to pipe the mine water discharge into the North Fork of the Gunnison, <br />please add this discussion to the permit, along with pertinent designs. If any <br />such structures are built that go beyond the current permit boundary, then, a <br />revised permit boundary that includes these structures, and appropriate right-of- <br />entry information for that new permit land, need to be supplied. <br />BRL has not responded to this question yet. Please provide a response. <br />9d. On proposed revised page 2.04-35, it is stnted that sediment loading wozdd be the <br />only impact of the mine on surface water. In light of the statemen[ concerning <br />mine water discharge, please modify the statement on page 1.04-35 to include <br />mine water discharge. <br />The Division has no further concerns. Page 2.04-35 was revised in the May 12, <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.