My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-09-18_REVISION - M1977285
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977285
>
2006-09-18_REVISION - M1977285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:25 PM
Creation date
11/21/2007 10:37:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
Revision
Doc Date
9/18/2006
Doc Name
Bond Recalculation
From
DRMS
To
International Uranium (USA) Corp.
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 015 State :Colorado Permitfjob# :M-1977-285 <br />Date : 09/15/2006 <br /> County :San Miguel Abbreviation : none <br />User: RCO S <br /> ite:SundayMine Filename: M285-015 <br />Agency or organization name : DRMS <br />Permit or other job action :Final reclamatron (7R-02 updated) <br />Task description :Grade backfilled surface at 7 vent hole sites (combined) <br />HOURLY EQUIPMENT COST ~ ~ ~ .. <br /> Basic machine :Cat D6R LGP - 6S (2003) Horsepower : 185 <br /> Blade type :Straight <br /> Attachment no. 1 : ROPS Cab Shift basis : i per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown • Ownership cost/hour : $31.45 NA <br /> Operating cosUhour : $44.58 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cost hour : $32.78 NA <br /> Total unit cosUhour : $108.82 Total fleet costihour : $108.82 <br />MATERIAL QUANTITIES <br />Initial Swell <br />Loose <br />volume : 700 LCY factor : NA volume : 700 LCY <br />Source of estimated volume :Updated reclamation map <br />Source of estimated swell factor :n/a <br />HOURLY PRODUCTION Job Contlition Correction Factors ~~ <br />Source <br /> <br />Average push distance : <br />50 feet Operator skill : 0.75 (avg.) <br /> <br />Unadjusted hourly production : <br />444 <br />6 LCY/hr Material consistency : 1.20 (Cat HB) <br /> . Dozing method : 1.00 <br />(gen.) <br /> <br />Material consistency description <br />: Visibility : 1.00 (avg.) <br /> <br />Loose stockpile Job efficiency : 0.83 <br />(1 shi/f/dayJ <br /> Spoil pile : 0.70 (fnd-mf) <br /> <br />Average push gradient : <br />0.00 % (pos) Push gradient: 1,00 (CatHB) <br /> <br />Average site altitude : <br />5 <br />800 f Altitude : 1.00 (Cat HB) <br /> , <br />eet Material wei <br />ht ; 0 <br />70 <br /> g . (Cat HB) <br /> <br />Material wei <br />ht : <br />3 <br />300 Blade type : 1.00 (S/SU/U) <br />g , <br />Ibs/LCY Net correction : 0 <br />36 <br />Weight description . <br />Decomposed rock- 75% Rock, 25% Earth Adjusted unit producti <br /> on : 161.97 L CY/hr <br /> Adjusted fleet production : <br />m~. 161.97 L <br />.--m..-~ ~....m CY/hr <br /> <br />JOB TIME AND COST - <br />~ ~ <br />~ <br />- _.. . . <br />Fleet size : 1 Dozers) Total job time : 4.32 Hours <br />Unit cost : $0.672 /LCY Total job cost : $470 <br />
The URL can be used to link to this page
Your browser does not support the video tag.