My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-09-18_REVISION - M1977285
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977285
>
2006-09-18_REVISION - M1977285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:25 PM
Creation date
11/21/2007 10:37:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
Revision
Doc Date
9/18/2006
Doc Name
Bond Recalculation
From
DRMS
To
International Uranium (USA) Corp.
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 014 <br />Date : 09/15/2006 <br />User : RCO <br />State :Colorado <br />County :San Miguel <br />Site :Sunday Mine <br />Agency or organization name : DRMS <br />Permit or other job action :Final reclamation (TR-02 updated) <br />Task description :Ripping compaction on pad and dump areas <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br />Dozer operating cost/hour : $98.84 100 <br />Ripper operating cosUhour : $7.51 100 <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $212.05 Total fleet cost/hour : $212.05 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA <br />Area : 5.00 acres Rip depth (ft) : 1.00 <br />Permit/job # :M-1977-285 <br />Abbreviation :none <br />Filename : M285-014 <br />Bank volume : NA BCY <br />Volume : 8,067 BCY or CCY <br />Source of estimated quantity :updated reclamation map <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feet/second <br />Unadjusted production : NA cu. yds./hour <br />Area : Avg. ripping depth : 1.00 feeVpass <br />Average ripping width : 7.67 feeVpass <br />Average ripping length : 500.00 feetpass <br />Average dozer speed : 88.00 feet minute <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.891 acres/hour <br />Unadjusted production : 1,436.70 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozers) <br />Unit cost : $0.178 per cu. yd. <br />Unadjusted production <br />per selected method : 1,436.70 cu. yds./hour <br />Site altitude : 5,800 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shifUday) <br />Net job correction : 0.83 multiplier <br />Adjusted unit production : 1,192.46 cu. yds./hour <br />Adjusted fleet production : 1,192.46 cu. yds./hour <br />Total job time : 6.76 hours <br />Total job cost : $1,434 <br />
The URL can be used to link to this page
Your browser does not support the video tag.