My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-09-18_REVISION - M1977285
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977285
>
2006-09-18_REVISION - M1977285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:25 PM
Creation date
11/21/2007 10:37:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
Revision
Doc Date
9/18/2006
Doc Name
Bond Recalculation
From
DRMS
To
International Uranium (USA) Corp.
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 013 <br />Date : 09/15/2006 <br />User : RCO <br />State :Colorado PermiUjob # : M-1977.285 <br />County :San Miguel Abbreviation :none <br />Site :Sunday Mine Filename :M285-013 <br />Agency or organization name : DRMS <br />Permit or otherjob action :Final reclamation <br />Task description :Ripping comp. <br />HOURLY EQUIPMENT COST <br />on vent shaft roads <br />Basic machine :Cat D6R LGP - 6S (2003) Horsepower : 185 <br />Blade type :Straight <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $31.45 NA <br />Dozer operating cosUhour : $44.58 100 <br />Ripper operating cosUhour : $2.95 100 <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $111.76 Total fleet cosUhour : $111.76 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 1.18 acres Rip depth (ft) : 1.00 Volume : 1,904 BCY or CCY <br /> <br />Source of estimated quantity :updated reclamation map <br />Source of estimated load factor ; NA <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity ; NA feeUsecond Unadjusted production <br />Unadjusted production ; NA cu. yds./hour per selected method : 1,232.52 cu. yds.lhour <br /> <br />Area : Avg. ripping depth : 1.00 feeUpass Site altitude : 5,800 feet <br />Average ripping width : 6.58 feeUpass Altitude adjustment : 1.00 (Caf HB) <br />Average ripping length : 500.00 feeUpass Job efficiency factor : 0.83 (1 shiff/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.764 acres/hour Adjusted unit production : 1,023.00 cu. yds./hour <br />Unadjusted production : 1,232.52 cu. yds./hour Adjusted fleet production : 1,023.00 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozers) Total job time : 1.86 hours <br />Unit cost : $0.109 per cu. yd. Total job cost : $208 <br />
The URL can be used to link to this page
Your browser does not support the video tag.