Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 016 State :Colorado <br />Date : 09/15/2006 County :San Miguel Abbreviation :none <br />User: RCO Site :Sunday Mine Fifename:M285-016 <br />Agency or organization name :DRMS <br />Permit or other job action :Final reclamation (TR-02 updated) <br />Task description :Spread topsoil on portion of pad area <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br />Operating cosUhour : $98.84 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unitcost/hour : $204.53 Total fleet cost/hour : $204.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 1,555 LCY <br />factor: NA volume: 1,555 LCY <br />Source of estimated volume :Updated reclamation <br />Source of estimated swell factor :n/a <br />HOURLY PRODUCTION Job Condition Correction Fac[ors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 2,110.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description <br />Loose stockoile <br />Average push gradient : 0.00 <br />Average site altitude : 5,800 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth -Dry packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />PermiUjob# : M-1977-285 <br />Job efficiency : 0.83 (1 shifUday <br />Spoil pile : 0.70 (fnd-mf) <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.47 <br />Adjusted unit production : 995.03 LCY/hr <br />Adjusted fleet production : 995.03 LCY/hr <br />Total job time : 1.56 Hours <br />Unit cost : $0.206 /LCY Total job cost : $320 <br />