Laserfiche WebLink
<br />D <br />• It[. Comments - Compliance <br />.W. <br />' y 0elow are Comments on the inspecttion:" Tl~e Comments inctudn•discussion of <br />. ouservations maaa.,during t~~e inspection. Comments nlso describe any <br />enforcement actidhs taken during the inspection end the facts or evidenre <br />• supporting the enfgrcement action. <br /> • pond had recentl,v been discharged. <br />MB-2: •At the time oP file inspection,'water from MS-B was being <br /> pumped into MB-'l. Flocculent wes being added at the <br /> inlet to MB-2. The other inlet to MB-2w,~ias flowing. <br /> Flocculent waa also being added and settling immediately <br /> upon entering the pond. <br />,. Mll-3: <br />' .; '.~~{0.t the time ~P they ~nayyept~ioq M!!-3. held a small ojmount of <br />r i <br />+ <br />- • <br />1' r I <br /> ; <br />• <br />~ <br />r <br />aster. <br />• MB-4: The operator le considering installing an oil skimmer in <br /> MB-4. Tn'addition, a gated principal api.llr+ey .ia belrtQ <br />' considered. ,~ revision would be requirg~i~,po install <br /> either of the items. May bales located acroae the <br /> emergency aplllway should be removed, or designs ahou.ld <br /> be provided. <br />MB-6: Water level F•aa over the gated opening, but the pond was <br /> oat discharging. <br />Md-6: Tlye pond had begun to be cleaned prior to the rainstorm. <br /> Material pushed out oP the pond should be removed and <br /> transported to the refuse pile. This tank began Prior to <br /> the conclusion of the inspection. Water was being pumped <br /> • to MR-2 .in attempt to further .dry out tl:e pond ao <br /> ' cleaning could coiytinue. <br />~• <br />,. <br />•i <br /> <br />~~.,,. <br />