My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE23992
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE23992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:00 PM
Creation date
11/21/2007 10:35:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Enforcement
Doc Date
9/7/1993
Doc Name
Request for Vacation & Information on NOV
From
ARCO
To
DMG
Violation No.
CV1993113
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..' <br />If[. Comments - Compliance <br />'. ..• Betaw are comment4 on the inspection. The comments in:tudr'"discussion of <br />ouservations nu as„curing tiro inspection. Conment; also destrlire any <br />enforcement atiidns taken during the inspe:tion and the facts or evidenre <br />supporting the enforcement action. <br />1'he operator plane to eonstrrtct a roof over the barrel storage area <br />nett to the fuel bay. A reviYion should ba provided to the <br />Division prior to corrstructlon of the roof. <br />TOPSOIL <br /> <br />All topsoil and subsoil resources should continue to be protected <br />from wind nd water.eros.ion. ThQQ D,ivis~on.would recommend thst the <br />operator ease using ~'ubsofl fbr con~strucTilon pro,jee.ta until tan <br />' accax•ate topsoil bslanoo can be estimated. This is currently being <br />calculated in Technical Revisioix No. 64. It was determined that <br />two topsoil piles, formally located along the Sylvester Gulch road, <br />had been moved to the henchea of the refuse pile wit~I~~,lt approval <br />from the Division. Therefore, NOV C-93-113 was ieaued. <br />FYCES9 SPOIL 4Nj2 ~1<VfLOPMEi1T W.aSTJ± <br />At.the Limo of the insyection there was one area on the western <br />slope of the pile that wua conveying water over the face of .the <br />refuse piie. This was evidenced by the formation oP rills that <br />be~arr at the top of the pile. Prior to the eoncluaion of the <br />inspection, the operator con3tructed a berm in this ore's to prevent <br />water Prom flowing over tt,e face of the pile. 'The operator <br />conti.ri~rns and should continue to maintain a berm ar,d silt fence <br />arorrmi the Perimeter oP the pile, at the tap of the pile. MCC <br />should complete the rnclasi<-tion of the western s.lde oP Lire refuse <br />pile, including seeding, prior to the end of this field season. <br />~l fID REPUR'P <br />~ , , <br />• !l8-1: <br />1 , <br />The operator's pond inspection report for' the second <br />quarter of 1993, noted a seep at the NW corner of the toe <br />of tho embarxl:ment near the SW corner of the surface chap. <br />At th~: time of the Division's inspection the embankment <br />wns d,smp, an~i there was standing water of the gravel pad <br />below ttre emhanlx,nerrt. 7'hure are cattails growing, which <br />is evidence thnt Lire seep has bean active for some time, <br />This area should continua to be monitored, .to identify <br />the source of the water. There wore some cracks noted on <br />the north side o! the pond, on top of the embankment. I <br />am not au re iP the rracka nx•e related to settlement or <br />irrstabllity oP the embank;meet. The cracks should <br />continue to Le monitored to determine for signs of <br />instability. The water level in MB-1 Mss low, as Chc <br />. ,.:. <br />
The URL can be used to link to this page
Your browser does not support the video tag.