Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organiza tion name :Colorado Division Of Reclamation, Mining And Safety <br />Task # : 01F State :Colorado Permitfjob # :X227-01 <br />Date : 08/102007 County :Routt Abbreviation :none <br />User : JHB Site :Big Elk Exploration Filename :X-Ol-O1F <br />Permit or other job action :Amendment Of (June 18, 2007) <br />Task description :Nlob%li2e/delllob equ%pMer-t ffOm <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 perday <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, SOT, and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cosUhour : $16.63 $18.37 $22.33 <br /> OperatingcosUhour: $44.38 $46.13 $50.07 <br /> Operator cosUhour : $27.66 $27.66 $27.66 <br /> Helper cosUhour : $0.00 $25.39 $25.39 <br /> Total Unit CosUhour : $88.67 $117.55 $125.45 <br />Machine WeighUunit Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT permit <br />Description (Tons) CosUhr/unit CosUhr/unit (No. units) CosUhr/fleet CosUhdfleet CosUfleet <br />-Seeding equipment ~ 20.00 ~ $25.00 ~ $88.67 ~ 1 ~ $113.67 $88.67 ~ $0.00 <br />-REEDRILL SK5AD, 7.0 in. 27.50 $53.43 $117.55 1 $170.98 $117.55 $0.00 <br />Subtotals : $284.65 $206.22 $0.00 <br />