Permit No
X200622701
IBM Index Class Name
Revision
Doc Date
8/10/2007
Doc Name
Cost Estimate Memo
From
Janet Binns
To
Dan Hernandez
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or otherjob action :Amendment Ol (June 18, 2007) <br />Task description : Respread topsoil over 3000 ft. reclaimed access roads <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 11- 8SU (200: Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $58.24 NA <br /> Operating cosUhour : $73.75 100 <br /> Ripper op. cost hour : $0.00 0 <br /> Operator cosUhour : $32.78 NA <br /> Total unit cosVhour : $164.77 Total fleet cost hour : $164.77 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,555 LCY factor : NA volume : 1,555 LCY <br />Source of estimated volume :amendment <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors <br /> Operator skill : 0.75 <br />Average push distance : 50 feet Material consistency : 1.10 <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 <br /> Visibility : 1.00 <br />Material consistency description : Job efficiency : 0.83 <br />Partly consolidated stockpile Spoil pile : 0.80 <br /> Push gradient : 0.99 <br />Average push gradient : 1.00 % (pos) Altitude : 1.00 <br />Average site altitude : 7,200 feet Material weight : 0.90 <br /> Blade type : 1.00 <br />Material weight : 2,550 Ibs/LCY Net correction : 0.49 <br />Weight description <br />Earth -Dry packed Adjusted unit production : 684.08 <br /> Adjusted Fleet production : 684.08 <br />Source <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 2.27 Hours <br />Unit cost : $0.241 /LCY Total job cost : $375 <br />
The URL can be used to link to this page
Your browser does not support the video tag.