My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV12553
DRMS
>
Back File Migration
>
Revision
>
REV12553
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:23:31 AM
Creation date
11/21/2007 10:33:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200622701
IBM Index Class Name
Revision
Doc Date
8/10/2007
Doc Name
Cost Estimate Memo
From
Janet Binns
To
Dan Hernandez
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT~~ ~ ~ ~ ~~ sheet 2 of 2~ <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description CosUhour/unit (No. units) CosUhr/fleet Cost/hr/fleet <br />-Water Tanker, 3, 500 Gal. $57.17 1 $57.17 $57.17 <br />-LightDutyPickup, 4x4, 1 T Crew $37.90 3 $113.69 $113.69 <br />Subtotals : $170.86 ~ $170.86 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Hayden <br />Transportation Cvcle Time : Non- Total one-way travel distance : 7.0 miles <br /> Roadable Roadable Average travel speed : 35.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.20 0.20 Total non-roadable mob/demob cost `: $481.00 <br />Return time (hours) = 0.20 0.20 'two round trips with Haul rig <br />Loading time (hours) = 0.25 NA Total roadable mob/demob cost": $68.34 <br />Unloading time (hours) = 0.25 NA "one rountl trip, no haul ng <br />Subtotals = 0.90 0.40 <br />JOB TIME AND COST Total job time : 1.80 hours <br />Total iob cost : $549 <br />
The URL can be used to link to this page
Your browser does not support the video tag.