My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV12326
DRMS
>
Back File Migration
>
Revision
>
REV12326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:23:18 AM
Creation date
11/21/2007 10:31:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979189
IBM Index Class Name
Revision
Doc Date
8/9/2001
Doc Name
CIRCES COST ESTIMATING SOFTWARE COST SUMMARY FORM
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 07/30/2001 <br />User: JCS <br />CIRCES Cost Estimating Software <br />BULLD02ER WORK <br />State :Colorado PermiVjob# : M-1979-189 <br />County :Arapahoe Abbreviation :none <br />Site : S-4 Pit Filename : M189-001 <br />Agency or organization name : DMG <br />Permit or other job action :ESTIMATE RECLAMATION COST <br />Task description : BACKFILL HIGHWALL IN BIG POND <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9U Horsepower : 405 <br />Blade type :Universal <br />Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3•shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $54.62 NA <br />Operating cosUhour : $96.43 100 <br />Ripper op.cosUhour : $0.00 0 <br />Operator cosUhour : $27.99 NA <br />Total unit cosUhour : $179.04 Total fleet cosUhour : $179.04 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 80.519 LCY factor : NA volume : 80,519 LCY <br />Source of estimated volume :PERSONAL ESTIMATE <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted hourly production <br />Material consistency description <br />Loose stockpile <br />268 feet <br />542.7 LCY/hr <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Sand and c/av -Loose <br />6.00 °6 Q <br />5.500 feet <br />2,700 Ibs/LCY <br />Job Condition Correction Factors <br />Operator skill <br />Material consistency :_ <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight :_ <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time <br />Unit cost : $0.736 /LCY Total job cost <br />0.75 <br />1.20 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />0.88 <br />1.00 <br />0.85 <br />1.00 <br />0.45 <br />Source <br />(Cat <br />(Cat HB) <br />243.21 LCY/hr <br />243.21 LCY/hr <br />331.07 Hours <br />$59,277 <br />
The URL can be used to link to this page
Your browser does not support the video tag.