<br />Task # : 002 <br />Date : 07/30/2001 <br />User : JCS <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado PermiUjob# : M-1979-189 <br />County :Arapahoe Abbreviation :none <br />Site : S-4 Pit Filename : M789-002 <br />Agency or organization name : DMG <br />Permit or other job action :ESTIMATE RECLAMATION COST <br />Task description :FILL DEWATER/NG TRENCH AROUND BIG POND <br />HOURLY EQUIPMENT COST <br />Basic machine : Caf D9R - 9U Horsepower : 405 <br />Blade type :Universal <br />Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3•shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $54.62 ~ NA <br />Operating cost/hour : $96.43 100 <br />Ripperap.cosUhour : $0.00 0 <br />Operator cosUhour : $2799 NA <br />Total unit cosUhour : $179.04 Total fleet cosUhour : $179,04 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 37,162 CCY factor : 1.135 volume : 42,179 LCY <br />Source of estimated volume :PERSONAL ESTIMATE <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 2,222.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshiiUday) <br />Partly consolidated stockpile Spoil pile : 0.80 (fnd-A) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (neg) Altitude : i.00 (Cat HB) <br />Average site altitude : 5,500 feet Material weight : 0.85 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2, 700 Ibs/LCY Net correction : 0.47 <br />Weight description <br />Sand and clay -Loose Adjusted unit production : 1035.82 LCY/hr <br /> Adjusted fleet production : 1,035.82 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers} Totaf job time : 40.72 Hours <br />Unit cost : $0.173 /LCY Total job cost : $7,291 <br />