Laserfiche WebLink
CIRCES Cost Estimatin~C Software <br />COST SUMMARY FORM <br />Date <br />User <br />30-Jul-2001 Permit or job no.: D-1979-189 <br />JCS Abbreviation : none <br /> Filename: D189-000 <br />Agency or organization name : DMG <br />Permit or job action :ESTIMATE RECLAMATION COST <br /> <br />TASK LIST~DIRECT COSTSI <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -BACKFILL H/GHWALL IN BIG POND dozer 1 331.0 $59,277 <br />002 -FILL DEWATERING TRENCH AROUND BIG POND dozer 1 41.0 $7,291 <br />003 -DEMOLISH OFFICE BUILDING demolish 1 8.0 $2.432 <br />004 -RIP COMPACTED AREAS ripper 1 7.0 $1,377 <br />005 -REVEG DISTURBED UPLAND AREAS revege 1 40.0 $11,745 <br />006 -REVEG WETALANDS AREAS revege 1 8.0 $2.775 <br />007 -MOB/DEMOB mobilize 1 4.0 $678 <br />008 -WEED CONTROL (3 VEARS) revege 1 24.0 $3, 000 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS. 483.0 $88,575 <br />' includes ~nllation factor atljuslment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />NA <br />~ 2~~~°\ <br />~° ~~ <br />Site : S-4 Pit <br />State :Colorado <br />County :Arapahoe <br />TOTAL DIRECT COST' ~ $88,575 <br />Liability insurance : 1.55 %o o/ direct total = $1,373 <br />Performance bond : 1.05 % o/direct total = $930 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 °6 of direct total = $8.858 <br />'not required (or eqp. operator serves as super.) TOTAL O 8 P = $11, 160 <br /> CONTRACT AMOUNT (direct + O 8 P) _ $99.735 <br />PROJECT MANAGEMENT- <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $4.987 <br />coNnNGENCr- NA' NA total= NA <br />contingencies eccrounfed /oral task level <br />TOTAL INDIRECT COST= $16,747 <br />TOTAL BOND AMOUNT (direct + indirect) = 5104,722 <br />