My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV12326
DRMS
>
Back File Migration
>
Revision
>
REV12326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:23:18 AM
Creation date
11/21/2007 10:31:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979189
IBM Index Class Name
Revision
Doc Date
8/9/2001
Doc Name
CIRCES COST ESTIMATING SOFTWARE COST SUMMARY FORM
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 09-Aug-2001 <br />User: JCS <br />Permit or job no.: M-1979-189 <br />Abbreviation : none <br />Filename: M189-000 <br />Agency or organization name : DMG <br />Permit or job action :ESTIMATE RECLAMATION COST <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -BACKFILL RIGHWALL /N BIG POND dozer 1 331.0 $59,277 <br />002 -FILL DEWATERING TRENCH AROUND BIG POND dozer 1 41.0 $7,291 <br />003 -DEMOLITION OF PERMANENT STRUCTURES demolish 1 8.0 $5.000 <br />004 -RIP COMPACTED AREAS ripper 1 7.0 $1.377 <br />005 -REVEG DISTURBED UPLAND AREAS revege 1 40.0 $11,745 <br />006 -REVEG WETLANDS AREAS revege 1 8.0 $2,775 <br />007 -MOB/DEMOB mobilize 1 4.0 $678 <br />008 -WEED CONTROL (3 YEARS) revege 1 24.0 $9, 000 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 463,0 $97,143 <br />' includes inflation lacfor adjustment of <br />INDIRECT COSTS <br />~~~ ~~II~~~~~II~~I~~ <br />Site : S-4 Pit <br />State :Colorado <br />County :Arapahoe <br />NA <br />ovERREAD AND PROFIT - Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />' not required (or eqp. operator serves as super.) <br />PROJECT MANAGEMENT- <br />Engineeringwork and/or contracUbid preparation <br />Reclamation management and/or administration <br />CONTINGENCY - <br />' contingencies accounted for at task level <br />TOTAL DIRECT COST'= $97,143 <br />1.55 % of direct total = $1,506 <br />1.05 % of direct total = $1,020 <br />NA' NA NA total = NA <br />10.00 °% o/direct total = $9,714 <br /> TOTAL O 8 P = $12,240 <br /> CONTRACT AMOUNT (direcl+08Pt= $109,383 <br />NA NA NA total = NA <br />5.00 % o/ Intr. NA total = $5.469 <br />NA' NA total = NA <br />TOTAL INDIRECT COST= $17,709 <br />TOTAL BOND AMOUNT (direct + indirect) = 5714,852 <br />
The URL can be used to link to this page
Your browser does not support the video tag.