Laserfiche WebLink
<br />EXHIBIT D <br />WATER PLAN <br />The proposed placer mining operation will purchase <br />and impound surface waters near the mine site. The applicant <br />plans to acquire four (4),cubic feet per second of water from <br />a canal source adjacent to the mining claims. Two (2) ten- <br />acre storage/settling ponds will be built nearby, with the <br />canal water used to fill the ponds initially and provide <br />process water for the mining operation. The actual process <br />waters will consist of a mixture of pond and canal water, with <br />the effluent pumped back to the ponds for settling of parti- <br />culates and re-use. During periods when the mine is inactive, <br />canal water will be used to recharge both ponds. <br />