My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV10896
DRMS
>
Back File Migration
>
Revision
>
REV10896
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:21:53 AM
Creation date
11/21/2007 10:17:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Revision
Doc Date
7/3/1990
Doc Name
BEAR COAL CO INC MID TERM PERMIT REVIEW PN C-81-033
From
JE STOVER & ASSOCIATES
To
MLRD
Type & Sequence
MT2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M. S. Hayes <br />Page 2 <br />June 29, 1990 <br />for the Bear No.l and No. 2 Mines should occur 10 years after the <br />1982 reclamation project or 1991. <br />5. Pages 2.03-16, 2.05-3R, 2.05-5R and 4.20-1 were revised <br />to reference B-Seam mining and Map 9a, the B-Seam mine projec- <br />tion. <br />6. Pages 2.05-6R and 2.05-7R were revised to reflect the <br />completion of the C-Seam mining and the current and projected <br />mining sequence in the B-Seam. <br />7. Pages 2.06-4 and 4.05-2 were revised to reflect the <br />fact that Bear Coal does not process coal on site. <br />8. The discussion on page 2.05-7R regarding storage of gob <br />underground was not revised. This discussion relates to hoca the <br />mine was rehabilitated in 1982. The discussion of gob storage <br />and gob disposal was expanded on page 4.09-1R. Rule 4.09.1(15) <br />is applicable to returning waste to the mine which is not rele- <br />vant to Bear's mining operation. <br />9. The discussion on page 2.05-25R regarding underground <br />development waste was updated and expanded. Rule 'L.05.3(9) is <br />also only applicable to returning waste to the mine. <br />10. The best information available for the lithology of DH- <br />1 and DH-2 is presented on Map 7. Anchor Coal Company had DH-1 <br />and DH-2 drilled in 1978. According to a representative of that <br />company, DH-1 and DH-2 were abandoned appropriately. In any <br />case, Bear Coal Company does not consider the abandonment of DH-1 <br />and DH-2 to be its responsibility. <br />11. The B-Seam fuel characterization was added on page <br />2.04-21. <br />12. Geochemical analyses of B-Seam floor coal, roof rock <br />overlying the B-Seam, and temporary waste storage piles #1 and #2 <br />are tabulated on page 2.04-24a. This data was evaluated accord- <br />ing to the guidelines for which the C-Seam geochemical data was <br />evaluated on pages 2.04-22 through 2.04-28. <br />13. Added discussion of water rights to page 4.05-10. <br />According to the information made available to me, water consump- <br />tion at the mine has not been monitored very closely. The Opera- <br />tor recently installed a flow meter in the line feeding the mine <br />which should provide some reliable water consumption information <br />by the end of the year. Therefore, the issue of water consump- <br />tion will be addressed in the next Annual Hydrologic Report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.