My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV10616
DRMS
>
Back File Migration
>
Revision
>
REV10616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:20:51 AM
Creation date
11/21/2007 10:14:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Revision
Doc Date
1/11/2002
Doc Name
FINDINGS OF COMPLIANCE FOR RN4
From
DMG
Type & Sequence
RN4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
aquifers are monitored for water level, field pazameters and major cations <br />and anions on a quarterly basis except for the winter quarter. Alluvial <br />wells in the Kerr Mine area are measured on a monthly basis during March <br />through October, while at the Loadout they are measured weekly during <br />March through June and monthly during July through October. In <br />addition, trace metal analyses are performed on alluvial well samples <br />during the spring and fall and on an annual basis for bedrock samples. in <br />the future, three additional wells will be installed in the pits as they are <br />backfilled to monitor the establishment of a spoils aquifer. <br />~Well~'aters. (;evelSam tin Fce ueuc ~` -'~'~. <br />Month ] F M A M J J A S O N D <br />Bedrock Wells S rin Fall <br />Alluvial Wells, <br />Mine 0* 0* 1 1 1 1 1 I 1 I 0 0 <br />Alluvial Wells, <br />Loadout 0* 0* 4 4 4 4 1 1 l 1 0 0 <br />*No sampling during winter months <br />' - "Well WaterCtierti'tcalAnal'sis,Sam tin ,Fre uenc <br />uarter 1st [r.* 2nd Qv. 3rd U. 4th v. <br />Bedrock Well S rin Fall <br />Alluvial Well, Mine 0* 1 1 1 <br />Alluvial Well, Loadout 0* 1 1 1 <br />*No sampling during winter months <br />2. The surface water monitoring plan was submitted under 2.05.6(3)(b)(iii)' <br />and includes the following (4.05.13(2)): <br />Surface sites are monitored weekly during March through June and <br />monthly during July through October. A full water quality suite (metals) <br />is performed on a semi-annual basis. Pond staff gauges aze read for water <br />and sediment levels semi-annually. Sediment pond discharge monitoring <br />is conducted as per the NPD$S permit on a weekly, monthly, and quarterly <br />basis as specified. Reporting is on a quazterly basis. All sediment ponds <br />are inspected, and a report submitted, quarterly. The monitoring schedule <br />can be found in the application as Table 61, Volume 3. <br />B. Stream Buffer Zones <br />The Division proposes to re-approve surface or underground mining <br />activities within 100 feet or through a perennial stream or stream with a <br />biological community. This decision is based on a finding [hat the original <br />stream channel will be restored, water quality and quantity shall not be <br />adversely affected, and appropriate ripazian vegetation will be <br />Marr Mine Permit Renewal 04 <br />1 l January, 2002 <br />-19- <br />
The URL can be used to link to this page
Your browser does not support the video tag.