My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV10616
DRMS
>
Back File Migration
>
Revision
>
REV10616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:20:51 AM
Creation date
11/21/2007 10:14:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Revision
Doc Date
1/11/2002
Doc Name
FINDINGS OF COMPLIANCE FOR RN4
From
DMG
Type & Sequence
RN4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reestablished. The buffer zone variance is granted to haul roads that cross <br />these riparian areas located adjacent to the haul roads between Pits 1 and 2 <br />and between Pits 2 and 3 (application pages 816-83, Volume 2, Rule <br />4.05.18(1)). <br />II. Topsoil <br />A. Pits 2 and 3 are not anticipated to be opened as previously proposed. Hence, <br />topsoil will be replaced at a minimum depth of .5 feet (page 816-126). Should <br />mining progress beyond Pit 1, however, the Division has determined that the <br />B horizon and portions of the C horizon shall be segregated and replaced as sub- <br />soil in order to ensure soil productivity consistent with the approved post-mining <br />land use (4.06.2(3)). Subsoils from Pit 3 will be placed on Pit 2 prior to topsoil <br />placement to ensure adequate depths of non-sodic plant growth medium. <br />III. Sealing of Drilled Holes and Underground Openings <br />A. The Division requires that each hole, well, or other underground opening be <br />capped, sealed, backfilled, or otherwise properly managed (4.07.3). The Division <br />has added Stipulation 23 addressing the need to have all of the monitoring wells <br />on BLM lands sealed and reclaimed by 31 May 2002. <br />The Division has added Stipulation 23 with the approval of Permit Renewal 04, <br />which states: <br />THE OPERATOR IS REQUIIZED TO SUBMIT A PLAN FOR THE <br />ABANDONMENT OF ALL WELLS LOCATED ON BLM PROPERTY NO <br />LATER THAN 25 JANUARY 2002. THIS PLAN NEEDS TO ADDRESS THE <br />PROPER ABANDOMENT AND SEALING OF ALL WELLS AND A <br />TIMETABLE SO THAT ALL WELLS ARE ABANDONED AND RECLAIMED <br />BY 31 MAY 2002. <br />IV. Use of Explosives <br />A. Extractive operations in the 720 Pit and Pit 1 have ceased. Blasting in those pits <br />will no longer occur. However, Pits 2 and 3 may open in the future, though it is <br />not currently anticipated that they will be. As such, the Division proposes to <br />approve blasting at times other than those described in the blasting schedule due <br />to unavoidable hazardous situations (permit application page 816-85ffffff, Rules <br />4.08.3(2)(b)(v) and 4.08.4(2)). <br />Marr Mine Peanil Renewal 04 <br />11 January, 2002 <br />-20- <br />
The URL can be used to link to this page
Your browser does not support the video tag.