Laserfiche WebLink
b. Minor Revision MR-32 was submitted on 16 January 1997 and proposed for approval <br />on 27 January 1997. This revision addressed changes to the ownership and controller <br />information. <br />c. Minor Revision MR-33 was submitted on 14 October 1997 and proposed for approval <br />on 23 October ]997. This revision was incorporated into Technical Revision 17. <br />d. Minor Revision MR-34 was submitted on 27 October 1999 and proposed for approval <br />on 1 November 1999. This revision addresses a revised solid waste disposal plan - <br />adding 2.8 acres of disturbance adjacent to the shop/wazehouse pad. <br />e. Minor Revision MR-35 was submitted on 5 June 2000 and proposed for approval on 6 <br />June 2000. This revision addressed the cattle-grazing plan for 2000. <br />f. Minor Revision MR-36 was submitted on 1 June 2001 and proposed for approval on 8 <br />June 2001. This revision addressed the cattle-grazing plan for 2001. <br />4. Bond Release Requests <br />a. Partial Phase I and Phase II Bond Release Request (SL-02) was submitted on 21 <br />September 2000 and found complete on 9 November 2000. The request received final <br />approval on 26 June 2001. The release request addressed the backfilling and regrading <br />of the loadout and vegetation establishment and hydrological restoration for the 720 Pit <br />and Pit 1. <br />b. Partial Phase I Bond Release Request (SL-03) was submitted on 17 May 2001 and found <br />complete on 13 August 2001. The request has not yet received final approval. The <br />release request addresses the backfilling and regrading and drainage reestablishment of <br />the Marr Pit. <br />History of Operations <br />The following is a brief history of the operations at the Marc Mine during the permit term from <br />March 1996 through March 2001. <br />Since the mine halted coal extraction in January of 1993, all activities at the Marr Mine were <br />limited to reclamation. <br />The 720 Pit and Overburden Stockpile Areas were reseeded in 1995. This was followed by the <br />reseeding of Pit 1 in 1996. Vegetation monitoring was performed on these areas in 1996 and 1999. <br />In 1999 the loadout was backfilled and regraded, proper drainage was reestablished, topsoil was <br />replaced and the area was reseeded. <br />Marr Mine Permit Renewal 04 <br />11 January, 2002 <br />-11- <br />