Laserfiche WebLink
<br />2.05.3(3) <br />K. Mine Office <br /> <br />This building houses the mine office and <br />is of wood frame construction on a concrete basement foundation. <br />L. ShOp9 and Warehouse <br />The shop and warehouse is a steel frame <br />building on a concrete slab. It houses the surface maintenance <br />and repair activities associated with operation of the under- <br />ground mine. The warehouse is used for receiving, storage and <br />issuing of materials and supplies used in the operation of the <br />mine. <br />M. B-Seam Portal <br />The B-Seam portal was the main portal <br />access for men, materials, supplies and coal transportation out <br />of the mine. The portal was sealed in 1986 after equipment was <br />removed from the mine. <br />N. Dump Station and Scales <br />The dump station is a concrete structure <br />with a rock bin, coal bin, structural steel cover, concrete truck <br />ramp and the rock bin, and belt conveyor from the coal bin. This <br />dump station receives the mined coal and passes it to the tipple. <br />In early 1990 a truck scale was added on the east side of this <br />facility. The truck scale is a Cardinal, 10-foot X 60-foot, <br />platform scale with a 60 ton capacity. During 1991 the dump <br />station was revised to allow trucks to drive "through" the struc- <br />ture in a east to west direction. This provides for an efficient <br />haul cycle because the trucks can run on the scale to be weighed <br />then proceed directly through the dump station where the coal is <br />unloaded. <br />O. Tinyle <br />The tipple is a steel structure on a <br />concrete foundation which receives the raw coal from the dump <br />station via a conveyor belt for transportation to the coal silo. <br />Associated with the tipple is a fenced transformer station and a <br />wood frame control building. <br />P. Coal Storage Silo <br />The coal storage silo is a concrete <br />cylindrical structure on a concrete foundation. This silo re- <br />ceives raw coal from the tipple via a conveyor belt, and accumu- <br />lates this coal for unit train loading on a daily basis. <br />2.05 - 7 <br />Rev. 3:8-08-91 <br />