My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV10571
DRMS
>
Back File Migration
>
Revision
>
REV10571
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:17:36 AM
Creation date
11/21/2007 10:13:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978210
IBM Index Class Name
Revision
Doc Name
GENERAL OVERVIEW
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AMENDED USR-847, SUP-369 <br />I. A completed application fors. <br />2. A detailed description of the method on mining operation. The description shall include: <br />a. The types and numbers of operation and processing equipment to be employed. <br />Mining and trucking operation (25t employees) <br />Engineering offices, Road and Bridge offices, adequate pazking for all operations, <br />storage facilities, lake and wetlands (l00 employees) <br />Gas facilities - number of users 500 <br />b. The number of shifts to be worked and the maximum number of employees. <br />100 employees work may work one to two shifts <br />the hours ofoperation are 5:30 a.m.-6:30 p.m. <br />c. Whether the operation will involve a wet or dry pit. <br />This will be a dry pit operation. We will pump the pit to build the wetland area <br />and mine. <br />d. County roads and bridges to be utilized. <br />All users of the facilities will use the existing access route to North 1 lth Avenue, <br />then north or south from there. Speed limit signs of 30 mph have been placed <br />from the gate to the end of the buildings. From there to the gravel pi[, l5 mph <br />speed limit signs have been placed. <br />e. The size of the area and stages to be worked at any one time. <br />The permitted mining areas aze USR-847 and SUP-369, consisting of 142.5 total <br />acres. <br />Pond # 1 (29 acres) has been completed and reclamation is underway. <br />Pond #2 (16 acres) is currently being mined. <br />Pond #3 (10 acres) will be the last and final mining phase at this location. <br />f A time table giving the periods of time which will be required for the various stages of <br />the operation. <br />The remaining aeeas to be mined will be Pond #2, which is 16 acres presently <br />being mined. The approximate time table for this location is from five to seven <br />years. <br />Pond #3, (10 acres) will follow. The time table for Pond #3 will also be <br />approximately five to seven years. <br />
The URL can be used to link to this page
Your browser does not support the video tag.