Laserfiche WebLink
7.1.3 The Contractor shall maintain record of the volume of water used <br />far dust control and report this amount to the Owner for water <br />rights accounting purposes. <br />8 HAULING AND ACCESS ROADS <br />8.1 The Contractor shall utilize existing roadways for access to the work areas <br />if possible. New access routes may be constructed within the footprint of <br />disturbance associated with the project construction. The Owner must <br />approve new access routes outside of the disturbance area. <br />8.2 Temporary access routes shall be reclaimed by the Contractor as described <br />in the Topsail, Seeding, and Mulching section of this specification. <br />8.3 Haul routes used by the Contractor for transport of materials and <br />equipment must be approved by the Owner. Haul trucks using Grand <br />County Road 3 must be rated for highway use. <br />O:\7333.15012003 update\SPECS\SPEC G.doc <br />SPEC G -ENVIRONMENTAL CONTROLS <br />PAGE 4 <br />