My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV10233
DRMS
>
Back File Migration
>
Revision
>
REV10233
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:58 AM
Creation date
11/21/2007 10:10:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
2/12/2004
Doc Name
Barge System 2004 Construction Technical Construction Specifications
From
Climax Molybdenum Company
To
DMG
Type & Sequence
TR14
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.3 Where bolt holes and bolt groupings are specified, they shall be punched or <br />drilled to final dimension. Torch cut holes will not be acceptable. <br />4.4 Prior to final painting, all components of matching assembly shall be <br />assembled in the shop to verify alignment and fitting. <br />4.5 After shop verification of alignment, all components that will be exposed <br />shall be sand blasted and painted with one primer coat and 2 finish coats. <br />4.6 All components or faces of components to be embedded in concrete shall <br />be sand blasted, and primed and painted per the above Specifications. <br />5 INSTALLATION <br />5.1 Assemblies shall be installed per the manufacturer's instructions, and to <br />the lines and grades shown on the Drawings. <br />5.2 Any field modifications to fabricated assemblies shall be cleaned, primed, <br />and touched up with the specified paint system or per the manufacturer's <br />recommendations. <br />D:V 333.15C\2003 update\SPECS\SPEC D.tloc <br />SPEC. D -STRUCTURAL <br />PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.