My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV10233
DRMS
>
Back File Migration
>
Revision
>
REV10233
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:58 AM
Creation date
11/21/2007 10:10:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
2/12/2004
Doc Name
Barge System 2004 Construction Technical Construction Specifications
From
Climax Molybdenum Company
To
DMG
Type & Sequence
TR14
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.3 VALVES <br />5.3.1 Valves shall be installed in strict conformance to the <br />manufacturer's recommendations and installation instructions. <br />5.5 POLYETHYLENE CULVERT PIPE <br />5.5.7 The pipe designated on the Drawings as ADS N-12 Culvert Pipe <br />shall be installed in strict conformance with the manufacturer's <br />recommendations and installation instructions. <br />6 QUALITY ASSURANCE AND TESTING <br />6.1 QUALIFICATION <br />6.1.1 All fusion joints made on the polyethylene pipeline shall be made by <br />a trained technician qualified by the pipe manufacturer or other <br />appropriate agency for joining polyethylene pipe. Proof of <br />technician qualification shall be submitted to the Engineer before <br />beginning any pipeline fusing. <br />6.2 DATA LOGGING <br />6.2.1 The Contractor shall data log all HDPE fusion joints made. The data <br />logs shall include the date, machine used, joint number, pipe size <br />and SDR, and recommended and actual fusion pressures and <br />temperatures, at a minimum. The data log reports shall be down <br />loaded and a hard copy provided to the Engineer every day that <br />HDPE joints are fused. Any joints that are deemed unsatisfactory <br />by the Engineer shall be removed and remade at the Contractor's <br />expense. <br />6.3 BENT STRAP TEST <br />6.3.1 The Contractor shall perform a Bent Strap Test on a strip sample <br />from the first fusion joint of each day that pipe fusion is to be <br />performed, or as otherwise requested by the Engineer. The Bent <br />Strap Test shall be performed as described in PPI Handbook of <br />Polyethylene Pipe -Inspections, Test, and Safety Considerations, or <br />as recommended by the manufacturer and approved by the <br />Engineer. The test sample must pass this test before fusion <br />operations can commence that day. <br />SPEC. C -PIPING <br />PAGE 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.