<br />MINING PLAN <br />With regard to the proposed amendment, operations will be divided into 5 separate phases. It is the <br />intention of the applicant to initially provide financial assurance for phases 1 and 2. At such time t~iat <br />actrv~ty will commence m the subsequent phases, the Division of Minerals and Geology will be notified <br />so that the warranty amount may be calculated on each additional phase, and that financial assurance <br />can be submitted prior to commencement of activity. <br />As depicted on the Mining Plan Map, Phase 1 consists of 14.1 acres, and includes the area of the <br />original permitted azea of M-88-037 (9.64 acres), the unpermitted area in San Miguel County that has <br />been used for gravel storage, equipment storage and scaling trucks (3.24 acres), and the unpermitted <br />area adjacent to the west of the permitted site (1.22 acre). <br />All subsequent phases aze areas that aze previously undisturbed by mining and have not been previously <br />covered by a reclamation permit. <br />Activities that will be conducted at this site are those that are typical to an open pit sand and gravel <br />mining operation, including removal and storage of topsoil and overburden soil, extraction and <br />processing of gavel products, including crushing, screening and washing, stockpiling of gravel <br />products, and the production of hot mixed asphalt and ready mixed concrete. Customary surface <br />mining techniques will be utilized. <br />The bulk of the mining will be accomphshed using front end loaders, track dozer, track excavator, and <br />portable crushing and washing plants. <br />1. <br />Mining activities will commence will the completion of mining of the original permitted area, in Phase <br />1. The overburden soil and topsoil that is to be removed from this area will be utilized to backfill the <br />disturbed area immediately west of the original permit. This area is discussed in item #3 on the <br />preceding page. Soils that are not needed to reclaim this area will be placed in storage as indicated on <br />the Mining Plan Map. <br />Gravel extraction will occur from the floor of the mine that has been established by prior activity. A <br />portable crusher plant will be situated on the floor of the pit near the gravel, bank and the processed <br />gravel will be placed in stockpile as needed adjacent to the plant. The gravel face at this location <br />ranges from 25 to 40 feet in height. The area that remains to be mined in Phase 1 is approximately 2.4 <br />acres. It is anticipated [Fiat the completion of mining of Phase 1 will occur within one year. Phase 1 <br />will continue to used for gavel storage for some time, until the excavation of Phase 2 has progressed <br />to the point that adequate space is available on the floor of the pit to store gravel in the area of <br />Phase 2. <br />An additional feature of Phase 1 will be a water storage pond that is to provide water for an aggregate <br />wash plant. The storage pond is depicted on the Mining Plan Map along the southern permit boundary. <br />4 <br />