Laserfiche WebLink
<br /> <br />TRAPPER MINE RESPONSE TO PR-1 ADEQUACY RESPONSE DOCUMENT <br />May, 1987 <br />Response <br />Equipment speeds for revegetation equipment are shown in Table 1.4-18 of <br />[he originally-submitted document. <br />4. The wage rate presented in Attachment 3.4 is a base rate. The oper- <br />ator has failed to include fringe benefits, F. I.C.A., and unemploy- <br />ment insurance. These factors must be included in the wage rate. In <br />addition, the operator has failed to include shift premiums for the <br />three-shift operation. <br />Response <br />The wage rate was increased to include a shift differential and FICA, <br />FUI, and SUI. <br />5. The operator must include lighting costs, as all other costs are <br />based on three shifts per day. <br />Response <br />The bond was recalculated to include light plant costs. <br />