My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV09218
DRMS
>
Back File Migration
>
Revision
>
REV09218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:09:45 AM
Creation date
11/21/2007 10:00:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Name
TRAPPER MINE RESPONSE TO PR-1 ADEQUACY RESPONSE DOCUMENT
Type & Sequence
PR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />TRAPPER MINE RESPONSE TO PR-1 ADEQUACY RESPONSE DOCUMENT <br />May, 1987 <br />Response <br />Equipment speeds for revegetation equipment are shown in Table 1.4-18 of <br />[he originally-submitted document. <br />4. The wage rate presented in Attachment 3.4 is a base rate. The oper- <br />ator has failed to include fringe benefits, F. I.C.A., and unemploy- <br />ment insurance. These factors must be included in the wage rate. In <br />addition, the operator has failed to include shift premiums for the <br />three-shift operation. <br />Response <br />The wage rate was increased to include a shift differential and FICA, <br />FUI, and SUI. <br />5. The operator must include lighting costs, as all other costs are <br />based on three shifts per day. <br />Response <br />The bond was recalculated to include light plant costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.