Laserfiche WebLink
<br />Attachment 3.1. Colt Pit Revision (PR-1) Bond Summary <br />Activity Coat <br />Regrade $ 58,093.26 <br />Topsoil 126,828.68 <br />Revegetation 48,401.03 <br />Lighting 2,758.96 <br />Subtotal $236,081.93 ' <br />Indirect Costs: <br />Public Liability Insurance (0.8%) $ 1,888.66 <br />Contractor Peformance Bond (0.7%) 1,652.57 <br />MLRD Administrative Expense (5%) 11,804.10 <br />Contractor Profit (10%) 23,608.19 <br />Job Supervisor (20 days x 24 hrs/day 14,400.00 <br />x $30/hr), includes vehicle <br />Subtotal $ 53,353.52 <br />Total $289,435.45 <br />JMM/jb 5/87 <br />