Laserfiche WebLink
Reclamation Timetable <br /> <br /> <br />Task # <br /> <br />Descri tion Time <br />needed <br />ears <br /> <br />1 Stripping of topsoil and mining yeaz 1 gravel, construct 2 topsoil <br />stock files and reclaim northern end of current it. <br />1 <br />2 Stri in of minor to soil and minin ear 2 avel. 1 <br />3 Stri in of minor to soil and minis ear 3 avel. 1 <br />4 Minin eaz 4 avel. 1 <br />5 Stri in of to soil and minin eaz 5 avel. I <br />6 Stri in of to soil and minin ear 6 avel. 1 <br />7 Stri in of to soil and minin ear 7 avel. 1 <br />8 Stri in of to soil and minin ear 8 avel. 1 <br /> <br />9 Stripping of topsoil and mining year 9 gravel and reclaim portion of <br />ear 8 area. <br />1 <br />10 Stri in of to soil and minin ear 10 vel. 1 <br /> <br />11 Stripping of topsoil and mining yeaz 11 gravel, and reclaim year 10 <br />slo es which are mined 3H:1 V <br />1 <br /> <br />12 Stripping of topsoil and mining year 12 gravel, and reclaim year 11 <br />slo es which are mined 3H:1 V. This is a laz a reclamation area. <br />1 <br /> <br />13 Stripping of topsoil and mining year 13 gravel, and reclaim yeaz 12 <br />slo es which aze mined 3H:IV. <br />1 <br /> <br />14 Stripping of topsoil and mining yeaz 14 gravel, and reclaim year 13 <br />slo es which ate mined 3H:1 V. <br />I <br /> <br />15 Mining year 15 gravel, and reclaim year 14 slopes which are mined <br />3H:1V <br />1 <br /> <br /> <br />16 Mining year 16 gravel, and reclaim year I S slopes which are mined <br />3H:1 V. Move all topsoil out of existing stockpiles (4) to reclaim the <br />remainin disturbed area. <br /> <br />1 <br />Total 16 <br />Once the final mining azea is completely excavated, it will take approximately 4 months to do <br />final backfilling, topsoil replacement from the 4 berms, seedbed prepazation and final seeding <br />and mulching. As seen on Map F-1, the total area consists of the following: <br />Area 1 -main mine azea: 29.47 acres <br />Area 2 -topsoil berms and roads: 7.56 acres <br />Area 3 -employee housing disturbed area: 2.78 acres <br />Total area for seeding and mulching at the end of the mine life: 39.81 acres <br />Vagneur Pit June 07 E-3 <br />