Laserfiche WebLink
51 <br /> Cresson Project <br /> Reclamation Cost Calculations <br /> Function: Draging - Plat Terra in Productivity: 3.8 acres/hr. <br /> S/hr. S/acre <br /> Labor <br /> 1 Equip. Operator @ 21.14 5.56 <br /> Equipment <br /> 1 D8N Tractor @ 92.66 24.38 <br /> 1 Harrow @ 18.75 4.93 <br /> Materials <br /> <br />----------------- <br />------------- <br />----- <br />------ <br />-- <br />-- <br />-- <br />-- <br />- 0.00 <br /> - <br />- <br />-- <br />- <br />-- <br />Total S/acre --------- --------- <br />34.88 <br /> Function: Draging - Sloped Ter rain Productivity: 2.5 acres/hr. <br /> S/hr S/acre <br /> Labor <br /> 1 Equip. Operator @ 21.14 8.46 <br /> Equipment <br /> 1 D8N Tractor @ 92.66 37.06 <br /> 1 Slope Chain @ 16.20 6.48 <br /> Materials <br /> <br />-- <br />-- <br />- <br />-- 0.00 <br />- <br />- <br />- <br /> - <br />-- <br />-- <br />----- ------------- ----- ---------------------- <br />Total S/acre -------- - <br />--- <br />-- <br />- <br />52.00 <br />• Cost used slope chain = S2100 (52100/324 acres) = 56.48/acre <br />• <br />