Laserfiche WebLink
50 <br />Cresson Project <br />~, • Reclamation Cost Calculations <br />Function: Seeding - Flat Terrain Productivity: 2.8 acres/hr. <br />S/hr. S/acre <br />Labor <br />1 Equip. Operator @ 21.14 7.55 <br />Equipment <br />1 D8N Tractor @ 92.66 33.09 <br />1 Hoppers @ 25.00 8.93 <br />Materials <br />Seed Mix 286.99 <br />--------------------------------------------------------------------------- <br />Total S/acre 336.56 <br />Function: Seeding - Sloped Terrain Productivity: 1.0 acres/hr. <br />S/hr S/acre <br />Labor <br />1 Laborer @ 15.87 15.87 <br />Equipment <br />0.00 <br />Materials <br />Seed Mix 286.99 <br />--------------------------------------------------------------------------- <br />Total S/acre 302.86 <br />Function: Planting Trees do Shrubs Productivity: 0.5 acres/hr.• <br />S/hr Sfacre <br />Labor <br />1 Laborer @ 15.87 31.74 <br />Equipment <br />0.00 <br />Materials <br />Shrubs 84.00 <br />Trees 41.00 <br />----------------------------------------------------------------------------- <br />Total S/acre 156.74 <br />Seeding on sloped terrain is done by hand broadcasting. <br />• R.C. Means. Site Work & Landscape Cost Data. 1994. pg. 109. <br /> <br />