Laserfiche WebLink
49 <br />Cresson Project <br />Reclamation Cost Calculations <br />Function: Fertilizing <br />Labor <br />Equipment <br />Materials <br />Function: Ripping <br />Labor <br />Equipment <br />Materials <br />u <br />Productivity: 1.5 acres/hr. <br />S/hr. S/acre <br />1 Equip. Operator @ 21.14 14.09 <br />1 D8N Tractor @ 92.66 61.77 <br />1 Hoppers @ 25.00 16.67 <br />Nitrogen 49.80 <br />Phosphorus 11.88 <br />Potassium 7.89 <br />Total S/acre 162.10 <br />Productivity: 1.0 acres/hr. <br />S/hr S/acre <br />1 Equipment Operator @ 21.14 21.14 <br />1 D9N Dozer w/ripper @ 111.67 111.67 <br />0.00 <br />Total S/acre 132.81 <br /> <br />