Laserfiche WebLink
52 <br /> <br />Cresson Project <br />Reclamation Cost Calculations <br />Flu~ction: Mulching <br />Labor <br />Equipment <br />Materials <br />Productivity: 0.6 acres/hr. <br />S/hr. S/acre <br />2 Laborers @ 15.87 26.45 <br /> 15.87 26.45 <br />1 Truck Driver @ 17.83 29.72 <br />1 Light Truck - 1.5 ton 19.78 32.97 <br />1 Nydromulcher @ 12.05 20.08 <br />Mulch (wood fibre) 340.00 <br />Tactifier 68.00 <br />Water 7.58 <br />Total S/acre 551.23 <br />J <br />Productivity and equipment cost frga R.S. Means <br /> <br />