Laserfiche WebLink
<br />Haulage Detail <br />Reclamation Cost <br />Area: Globe Hi11-Ironclad Dump <br />Topsoil Haulage Detail <br /> Prod. Labor Equip. Material Hourly Total <br /> Equip. <br />--------- - Number <br />-------- Units <br />--------- Rate <br />----------- Hours <br />------- Cost <br />--------- Cost <br />-------- Cost <br />---- <br />--- Cost <br />- Cost <br /> <br />Haul Topsoil' - <br />-- - <br />------- --------- <br />Zone 1,2&3 773B 2.0 11380 183.5 31 17.83 106.95 0.00 124.78 7738 <br />Zone 4 <br />----- <br />- 773B 2.0 <br />- <br />-- 11120 220.6 <br />- <br />-- 25 <br />- 17.83 106.95 <br />-- <br />- 0.00 <br />-- 124.78 6290 <br />--------- <br />-- <br />Total -------------- ----- --------- <br />22500 - <br />---- <br />--- - <br />----- <br />56 --------- -- <br />--- -------- --------- --------- <br />14028 <br />Area: Arequa Gulc h Duos <br />Topsoil Haulage Detail <br /> Prod. Labor Equip. Material Hourly Total <br /> Equip. <br />-- <br />-- Number <br />--- <br />-- Units <br />-- <br />-- Rate <br />- <br />- Hours <br />- Cost <br />- <br />-- Cost <br />- Cost Cost Cost <br /> <br />Haul Topsoil: -- <br />--- <br />- --- -- <br />--- - <br />---- <br />---- - <br />----- ---- <br />-- -- <br />----- ---------- ---------- ------- <br />Zone 1 (A,B) 7736 2.0 16900 130.1 65 17.83 106.95 0.00 124.78 16209 <br />Zone 1 C,D 7736 2.0 4400 140.2 16 17.83 106.95 0.00 124.78 3916 <br />Zone 2 7738 2.0 20300 154.6 66 17.83 106.95 0.00 124.78 16384 <br />Zone 3 7738 2.0 6800 158.6 21 17.83 106.95 0.00 124.78 5350 <br />Zone 4 (A) 7736 2.0 8800 197.0 22 17.83 106.95 0.00 124.78 5574 <br />Zone 4 (B,C) 7736 2.0 14700 178.8 41 17.83 106.95 0.00 124.78 10259 <br />_________________ <br />Total ______________ ___________~_____-__________~___________-___ <br />71900 231 __________________ ___________-___-.r <br />57692 <br />Area: Carlton Heap Leach <br />Topsoil Haulage Detail <br /> Prod. <br /> Equip. <br />--------- - Number <br />-------- Units <br />--------- Rate <br />----------- Hours <br />-------- Cost <br />-------- Cost <br />--------- Cost <br />-- <br />-- Cost Cost <br /> <br />Haul Topsoil: -- <br />--- ---------- -------- <br />Bench 1 7738 3.0 9800 94.3 35 17.83 106.95 0.00 124.78 12968 <br />Bench 2 7738 3.0 31400 96.4 109 17.83 106.95 0.00 124.78 40644 <br />Bench 3 <br />--- 773E <br />-- <br />----- 3.0 <br />-- <br />--- 29200 <br />-- <br />---- 99.5 <br />---- <br />--- 98 <br />----- <br />-- 17.83 <br />- <br />- 106.95 0.00 124.78 36619 <br />-------------- <br />Total --- <br />--- <br />- --- - <br />-- <br />70400 -- <br />-- - <br />241 ---- <br />-- --------- --------- ---------- -------- <br />90231 <br />F <br />A <br />